Skip to Content
You may also like this products
My Cart

Ready to get started

Instructions for your hire equipment

Practical instructions for starting your beer tap installation and connecting your rinsing counter. Always follow the instructions supplied with your equipment.

Beer tap installation or tap trailer

Starting an ice-bank beer tap installation

These instructions describe the installation with a 90-litre water reservoir. Capacity and configuration vary by model, so check the instructions supplied with your equipment.

  1. Check the water level

    Transport or evaporation can lower the water level, preventing the installation from working properly. Check the reservoir and, if necessary, add ordinary tap water until the level is above the small copper tube.

  2. Start at least six hours in advance

    At least six hours before use, check the water level and top it up if necessary. Then plug the installation into a standard socket, using a suitable extension lead if needed. You will hear a humming sound.

  3. Keep the installation and kegs out of the sun

    Place the installation in the shade. Store spare full kegs indoors, preferably chilled. In very hot weather, the ice can melt quickly. Warm beer from a keg left in direct sunlight makes the ice reserve melt faster.

Rinsing counter on wheels or legs

Arrange the water supply and drainage

Connect the water supply

The rinsing counters have a standard Gardena connection for the water supply.

Arrange drainage for used water

Use a bucket or a suitable drain to collect or discharge the used water.

Help with your equipment

Is your beer tap installation not working as expected?

Follow the self-check for foam, temperature and flow. It lists the checks in a set order.

If the problem persists, use the technical support channel agreed in your quote or send us details of the problem.

Rent Solutions app

To install this Web App in your iPhone/iPad press and then Add to Home Screen.